Before / afterInterior RenovationFlooringKitchen and living-room open-up
Elmwood
A load-bearing wall removed, kitchen rebuilt, floors run through.
View this projectAn unfinished basement turned into a legal, bright lower floor.
Location
Crestview
Scope
7 weeks
Completed
August 2025
An unfinished basement with one small hopper window and a stair that arrived in the middle of the room.
The main work nobody sees: cutting and enlarging the foundation opening for a code-compliant egress window, and a new window well with a drain tied into the weeping tile. After that it was framing, insulation, a rebuilt stair landing, and finishes.
The room now takes real daylight, which is the difference between a basement and a floor of the house.
Scope of work
Before / afterInterior RenovationFlooringElmwood
A load-bearing wall removed, kitchen rebuilt, floors run through.
View this project
FenceRiverside neighbourhood
180 feet of six-foot cedar around an exposed corner lot.
View this project
DeckConcreteA hillside property in Hillcrest
A two-level composite deck stacked over a new concrete patio.
View this projectEvery one of these started with a free half-hour walkthrough and a written number. Yours can too.